Genetic study could make Grizzly Creek ideal for recovery

By Charlie Meyers The Denver Post

Funded in large part by MillerCoors, the Forest Service and Trout Unlimited and bolstered by a small army of volunteers, the effort will begin the first week of August with a launch of equipment and materials that will make the creek suitable for fish while erasing a rash of environmental scars.

A buck-and-rail fence will be installed to prevent motorized incursion, while a mile of unauthorized road will be obliterated to further aid in stream protection. At the same time, a single-track trail will be maintained for hiking and other backcountry uses.

Design and construction will be managed by Frontier Environmental Services, the firm that earlier was contracted by West Denver TU to design and build the so-called Golden Mile on Clear Creek.

The Clear Creek Watershed Foundation will oversee the project once it has been completed, an effort that includes on-ground remediation and metals reduction.

http://www.denverpost.com/extremes/ci_12933965