Pipeline project stirs attention in Ark Valley

Public has until April 29 to comment on Southern Delivery System evaluation. "One problem with the EIS, noted by Drew Peternell, director of Trout Unlimited’s Colorado Water Project, is that it measures all of the alternatives against a no-action alternative, which Colorado Springs revised in 2007."

First in a series. http://www.chieftain.com/metro/1206252000/3

By CHRIS WOODKA THE PUEBLO CHIEFTAIN